MAJOR SCHOOL PROJECTS
(Costs shown are for total project, including sitework, all equipment, fees and administrative costs.)
 

Keene Middle School (Under design)

  New Middle School  165,000 S.F.  
  New SAU building  9800 S.F.  
  Total Project
 $48,168,000
 
 

Marlborough Elementary School (Under construction)

Marlborough, New Hampshire
  New Elementary School 48,600 S.F.  
  Total Project
$10,247,000
 
 

Pinkerton Academy - Freshman Academy Building (Under construction)

Derry, New Hampshire
  New Academic Building 135,000 S.F.  
  New Track & Athletic Fields    
  Total Project
$31,606,000
 
 
  Structural Engineer JSN Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering & Light Design
  Civil Engineer Meridian Land Services 
  Construction Manager Eckman Construction  
 

Amherst Schools (Under construction)

Amherst, NH

  Amherst Middle School
$706,090
 
  Wilkins Elementary School
$2,249,270
 
  Clark Elementary School
$1,039,640
 
  Total Project
$3,995,000
 
 
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Integrated Engineered Systems
  Electrical Engineer Reno Engineering & Light Design
  Construction Manager Conneston Construction
 

Londonderry South Elementary School, 2008

Londonderry, New Hampshire
  Additon & Renovations 14,400 S.F.  
  Total Project
$5,500,000
 
 
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates Engineering
  Electrical Engineer Reno Engineering & Light Design
  Civil Engineer Stantec 
  Construction Manager ProCon Construction  
 

Newport Schools, 2008

Newport, NH

  Middle/High School
$2.973,000
 
  Richards Elementary School
$7,178,000
 
  Towle School
$324,000
 
  Total Project
$10,475,000
 
 
  Structural Engineer Fisher Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering & Light Design
  Construction Manager Eckman Construction 
 

Jaffrey Rindge Middle School & Conant High School Addition & Renovation, 2008

Jaffrey, New Hampshire
 

Addition & Renovation and New Track & Field Facility

93,000 S.F.  
  Total Project
$9,961,000
 
 
  Structural Engineer Fisher Engineering
  Mechanical Engineer WV Engineers
  Electrical Engineer WV Engineers
  Civil Engineer Meridian Land Services 
  Construction Manager Eckman Construction  
 

Epping Middle / High School, 2007

Epping, New Hampshire
  Addition 76,300 S.F.  
  Total Project
$12,500,000
 
 
  Structural Engineer Fisher Engineering
  Mechanical Engineer Rist-Frost Shumway Engineering
  Electrical Engineer Rist-Frost Shumway Engineering
  Civil Engineer Provan and Lorber Engineering 
  Construction Manager Conneston Construction Inc 
 

Bedford Middle / High School, 2007

Bedford, New Hampshire
  New Middle/High School

336,000 S.F - 1,900 students

  Total Project
$50,000,000
 
 
  Structural Engineer JSN Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering
  Civil Engineer Meridian Land Services 
  Construction Manager Eckman Construction 
 

New Hampshire Community Technical College Addition, 2007

Manchester, New Hampshire
  Health Education & Library Addition 54,350 S.F.  
  Total Project
$9,170,000
 
 
  Structural Engineer JSN Associates
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering & Light Design
  Civil Engineer Meridian Land Services 
  General Contractor Eckman Construction  
 

Goffstown Kindergarten, 2006

Goffstown, New Hampshire
  New Kindergarten 16,330 S.F.  
  Total Project
$3,345,000
 
 
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Rist-Frost Shumway Engineering
  Electrical Engineer Rist-Frost Shumway Enginering
  Civil Engineer True Engineering  
  Construction Manager ProCon Construction 
 

Londonderry North School Addition & Renovation, 2006

Londonderry,New Hampshire
  Additon 16,060 S.F.  
  Renovations    
  Total Project
$5,500,000
 
 
  Structural Engineer Fisher Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Enginering
  Civil Engineer Holden Engineering  
  Construction Manager Pro Con Construction 
 

Heron Pond Elementary School Addition, 2006

Milford,New Hampshire
 
  Addition 21,430 S.F.  
  Total Project
$3,300,000
 
 
  Structural Engineer Rist-Frost Shumway Engineering
  Mechanical Engineer Rist-Frost Shumway Engineering
  Electrical Engineer Rist-Frost Shumway Engineering
  Civil Engineer Holden Engineering  
  Construction Manager Baybutt Construction 
 

Winnacunnet High School, 2006

Hampton, New Hampshire
  New Free-standing Gymnasium 45,000 S.F.  
  High School Renovations 57,300 S.F.  
  High School Addition 50,000 S.F.  
  Site Renovations    
  Total Project
$26,850,000
 
 
  Structural Engineer Rist-Frost Shumway Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Rist-Frost Shumway Engineering
  Civil Engineer Meridian Land Services, Inc. 
  Construction Manager ProCon Construction 
 

Barka Elementary School, 2005

Derry, New Hampshire
  New Elementary School 94,000 S.F. - 700 students 
  Total Project
$12,760,000
 
 
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer Yeaton Associates, Inc
  Electrical Engineer Reno Engineering
  Civil Engineer Jesseman, Gallant & Associates 
  Construction Manager Eckman Construction 
 

Hood Middle School Additions & Renovations, 2005

Derry, New Hampshire
  Additions 66,000 S.F.  
  Total Project
$10,338,000
 
 
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering
  Civil Engineer Jesseman, Gallant & Associates 
  Construction Manager Eckman Construction 
 

Merrimack Middle School, 2004

Merrimack, New Hampshire
  New Middle School 120,000 S.F. - 875 students 
  Total Project
$17,000,000
 
 
  Structural, Mech & Elec. Engineers Rist-Frost-Shumway Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager Hutter Construction
 

Kensington Elementary School Addition & Renovations, 2004

Kensington, New Hampshire
  Additions 14,240 S.F.  
  Total Project
$1,950,000
 
 
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering
  Civil Engineer Parker Engineering 
  General Contractor Brookstone Builders 
 
Londonderry High School Additions & Renovations, 2003
Londonderry, New Hampshire
  High School Gym Building 49,000 S.F.  
  High School Additions 28,000 S.F.  
  High School Renovations 88,000 S.F.  
  Total Project
$13,700,000
 
    
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Construction Manager ProCon Construction
 
Winnisquam Regional High and Middle Schools Additions, 2003
Tilton, New Hampshire
  High School Addition 62,500 S.F.  
  High School Renovations 55,900 S.F.  
  Middle School Addition 16,800 S.F.  
  Middle School Renovations 53,500 S.F.  
  Total Project
$16,453,000
 
 
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer McGill Engineering
  Electrical Engineer Reno Engineering
  Civil Engineer White Mountain Survey Co., Inc.
  Construction Manager Bonnette, Page and Stone
   
Brett Elementary School Additions, 2003
Tamworth, New Hampshire
  Additions 22,740 S.F.  
  Total Project
$3,200,000
 
       
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer Yeaton Associates, Inc.
  Electrical Engineer Reno Engineering
  Civil Engineer White Mountain Survey Co., Inc.
  Construction Manager Bauen Corporation
       
Pinkerton Academy Arts and Humanities Center, 2002
Derry, New Hampshire
  New Arts Building and Theatre 130,000 S.F.  
  Total Project
$17,150,000
 
       
  Structural Engineer Rist-Frost-Shumway
  Mechanical Engineer Yeaton Associates, Inc.
  Electrical Engineer Reno Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager Bonnette, Page and Stone
       
Hills Garrison Elementary School
Memorial Middle School Additions and Renovations, 2002
Hudson, New Hampshire
  New Elementary School 75,000 S.F.  
  Middle School Addition 44,600 S.F.  
  Total Project
$17,625,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates, Inc.
  Electrical Engineer Reno Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager Eckman Construction, Inc.
       
Freedom Elementary School Addition, 2002
Freedom, New Hampshire
  Addition 14,800 S.F.  
  Total Project
$2,000,000
 
       
  Structural Engineer Rist-Frost-Shumway Engineering
  Mechanical Engineer Yeaton Associates, Inc.
  Electrical Engineer Reno Engineering
  Civil Engineer White Mountain Survey Co., Inc.
  Construction Manager Bauen Construction
     
Moose Hill School (Londonderry Kindergarten Building), 2001
Londonderry , New Hampshire
  New Kindergarten Building 35,000 S.F.  
  Total Project
$4,485,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates, Inc.
  Electrical Engineer Reno Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager ProCon
     
Heron Pond Elementary School 2001
Milford, New Hampshire
  New Elementary School 87,000 S.F.  
  Total Project
$8,895,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager Bonnette Page and Stone
       
Madison Elementary School Addition, 2001
Madison, New Hampshire
  Addition 17,790 S.F.  
  Total Project
$2,000,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Construction Manager Bauen Construction
       
Rochester Kindergarten Additions, 2000
Rochester, New Hampshire
  4 Additions 15,300 S.F.  
  Total Project
$3,580,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Civil Engineer Norway Plains Associates
  Construction Manager ProCon
       
Derry Elementary School Addition, 2000
Derry, New Hampshire
  2 Additions 36,000 S.F.  
  Total Project
$5,115,000
 
       
  Structural/Mechanical/Electrical Rist-Frost-Shumway Engineering
  Civil Engineer Meridian Land Services, Inc.
  Construction Manager ProCon
       
Windham Schools Addition, 2000
Windham, New Hampshire
  Center School Addition 37,200 S.F.  
  Middle School Addition 14,200 S.F.  
   Total Project
$5,992,000
 
     
  Structural Steffensen Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Civil Engineer Rist-Frost-Shumway
       
Parkside Middle Schools Addition, 1999
Manchester, New Hampshire
  Addition 26,300 S.F.  
   Total Project
$2,440,000
 
     
  Structural/Mechanical/Electrical Rist-Frost-Shumway
     

Belmont High School, 1998

Belmont, New Hampshire
  New High School - 500 students 71,6000 S.F.  
   Total Project
$6,400,000
 
     
  Structural/Electrical Rist-Frost-Shumway
  Mechanical Engineer Yeaton Associates
  Civil Engineer T & M Associates
       
Exeter Region Cooperative Middle School, 1998
Stratham, New Hampshire
  New Middle School - 1,250 students 175,000 S.F.  
  Total Project
$15,700,000
 
       
  Structural Engineer Rist-Frost-Shumway
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Civil Engineer Jones & Beach Engineers
  Construction Manager Hutter Construction
       
McLaughlin Middle School, 1998
Manchester, New Hampshire
  New Middle School - 800 students 105,000 S.F.  
  Total Project
$9,400,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Reno Engineering
  Civil Engineer Costello Lomasney & DiNapoli
       
Londonderry Schools Additions & Renovations, 2000
Londonderry, New Hampshire
  North and South Schools Additions 14,000 S.F.  
  High School Addition & Renovation 28,000 S.F.  
  Junior High School Addition & Renovation 70,000 S.F.  
  Total Project
$10,600,000
 
     
  Structural/Mechanical/Electrical/Civil Rist-Frost-Shumway
       
Gilmanton Elementary School Additions & Renovations, 1997
Gilmanton, New Hampshire
  Addition 24,000 S.F.  
  Total Project
$2,000,000
 
       
  Structural/Electrical/Mechanical Rist-Frost-Shumway
       
Pinkerton Academy Science Facility, 1996
Derry, New Hampshire
  New Science Building 70,390 S.F.  
  Total Project
$7,000,000
 
       
  Structural Engineer Steffensen Engineering
  Mechanical /Electrical Engineer A & K Engineering
  Civil Engineer Rist-Frost-Shumway
       
Timberlane Regional Middle School Additions, 1996
Plaistow, New Hampshire
  Addition 30,920 S.F.  
  Total Project
$2,945,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical/Electrical Engineer Rist-Frost-Shumway
     
West Running Brook Middle School, 1995
Derry, New Hampshire
  New Middle School - 750 students 107,000 S.F.  
  Total Project
$8,500,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical /Electrical Engineer A & K Engineering
  Civil Engineer Appledore Engineers
       
Greenland Central School Additions & Renovations, 1995
Greenland, New Hampshire
  Additions & Renovations 16,100 S.F.  
  Total Project
$1,607,380
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Robert W. Bura, Inc.
       
Shaker Regional High School Renovations, 1995
Belmont/Canterbury, New Hampshire
  Renovations 20,000 S.F.  
  H.S. Renovations
$750,000
 
  New Athletic Field
$220,000
 
  Total Project
$970,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical /Electrical Engineer Rist-Frost-Shumway
       
Bethlehem Elementary School Addition & Renovation, 1993
Bethlehem, New Hampshire
  Addition & Renovation 4,620 S.F.  
  Total Project
$740,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Bennett Engineers
     
Elm Street Junior High School Renovation, 1992
Nashua, New Hampshire
  Renovations 198,000 S.F.  
  Total Project
$6,800,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott, Jr.
       
Whitefield Elementary School, 1992
Bethlehem, New Hampshire
  Addition & Renovation 52,220 S.F.  
  Total Project
$4,600,000
 
       
  Structural Engineer Tirey & Associates
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Walbach Associates
  Civil Engineer Provan & Lorber
       
North Elementary School Additions, 1992
Londonderry, New Hampshire
  Addition & Renovation 4,000 S.F.  
  Total Project
$398,000
 
       
  Mechanical/Electrical Engineer A & K Engineering
       
Rochester Vocational Center, 1991
Rochester, New Hampshire
  Addition & Renovation 88,000 S.F.  
  Total Project
$7,605,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott
  Civil Engineer Appledore Engineering
       
Spaulding High School Gymnasium, 1991
Rochester, New Hampshire
  Addition & Renovation 26,500 S.F.  
  Total Project
$1,500,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott
  Civil Engineer Appledore Engineering
       
Hood Junior High School Renovations, 1991
Derry, New Hampshire
  Total Project
$1,500,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott
       
Bedford Elementary Schools Additions, 1990
Bedford, New Hampshire
  Peter Woodbury School 13,120 S.F.  
  Memorial School 11,500 S.F.  
  Total Project
$2,898,000
 
       
  Structural Engineer Bussiere Engineering
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott
  Civil Engineer Riesland Associates
       
Newfound Regional High School, 1989
Bristol, New Hampshire
  New High School - 700 students 102,700 S.F.  
  Total Project
$9,112,000
 
       
  Structural Engineer Lawes Consulting Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Charles Abbott
  Civil Engineer Riesland Associates
       
Hillsboro High School, 1988
Hillsboro, New Hampshire
  New High School - 400 students 65,000 S.F.  
  Total Project
$6,500,000
 
       
  Structural Engineer Lawes Consulting Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Integrated Engineering Systems
  Civil Engineer Phillips & Emberley
       
Raymond High School, 1988
Raymond, New Hampshire
  New High School - 700 students 94,000 S.F.  
  New High School
$6,350,000
 
   Renovations to existing Middle School
 $300,000
 
  Total Project
$6,650,000
 
       
  Mechanical /Electrical Engineer LeMessurier Consulting Engineers
  Civil Engineer Dufresne-Henry
       
Merrimack Valley Middle School, 1988
Penacook, New Hampshire
  New Middle School - 600 students 71,000 S.F.  
  Total Project
$4,970,000
 
       
  Structural Engineer Lawes Consulting Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Stock & Abbott
  Civil Engineer Dubois & King
       
Litchfield Middle School, 1988
Litchfield, New Hampshire
  New Middle School - 400 students 51,000 S.F.  
  Total Project
$3,850,000
 
       
  Structural Engineer Meadows Engineering
  Mechanical/Electrical Engineer Integrated Engineering Systems
  Sanitary Engineer Carron Engineering
       
Hampstead Elementary School Addition, 1988
Hampstead, New Hampshire
  Additions & Renovations 30,500 S.F.  
  Total Project $3,109,000  
       
  Structural Engineer Lawes Consulting Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Stock & Abbott
  Civil Engineer Phillips & Emberley
       
Gonic Elementary School Addition, 1988
Gonic, New Hampshire
  Addition 25,000 S.F.  
  Total Project
2,150,000
 
       
  Structural Engineer Bussiere Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Stock & Abbott
       
Manchester Elementary School, 1987
Manchester, New Hampshire
  New Elementary School - 600 students 55,000 S.F.  
  Total Project
$3,850,000
 
       
  Structural Engineer John Jacobson Engineers
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Stock & Abbott
  Civil Engineer Dufresne-Henry
       
Grinnell Elementary School Addition, 1987
Derry, New Hampshire
  Addition 32,100 S.F.  
  Total Project
$2,220,000
 
       

Kearsarge Regional Elementary Schools, 1987

New London , New Hampshire
  Bradford - 160 students 24,000 S.F.  
  New London - 320 students 36,000 S.F.  
  Warner additions and renovations 9,700 S.F.  
  Total Project
$5,800,000
 
     
  Structural Engineer Lawes Consulting Engineers
  Mechanical/Electrical Engineer NF Laurence & Associates
  Civil Engineer Environmental Strategies
       
East Derry Elementary School, 1986
Derry, New Hampshire
  New elementary school - 600 students 58,000 S.F.  
  Total Project
$3,860,000
 
       
  Mechanical Engineer Yeaton Associates
  Electrical Engineer Stock & Abbott
  Sanitary Engineer Hoyle Tanner & Associates
       
Matthew Thornton Elementary School Additions, 1986
Londonderry, New Hampshire
  Additions 35,000  
  Total Project
$2,400,000
 
       
Wolfeboro Regional Vocation Center, 1983
Wolfeboro, New Hampshire
  New Vocational Center 38,000 S.F.  
  Total Project
$3,100,000
 
       
Freedom Elementary School, 1983
Freedom, New Hampshire
  New elementary school - 600 students 5,100 S.F.  
  Total Project
$265,000
 
       
Londonderry Junior High School, 1982
Londonderry, New Hampshire
  New school - 700 students 88,000 S.F.  
  Total Project
$4,665,000
 
       
Moultonboro Junior / Senior High School, 1981
Moultonboro, New Hampshire
  New school - 500 students 58,000 S.F.  
  Total Project
$3,100,000
 
       
Franklin High School Addition and Renovations, 1981
Franklin, New Hampshire
  Addition & Renovations    
  Total Project
$1,140,000
 
       
Sanborn Regional Middle School, 1978
Newton, New Hampshire
  Renovations 32,300 S.F.  
  Total Project
$920,000