| MAJOR
SCHOOL PROJECTS |
| (Costs
shown are for total project, including sitework, all equipment, fees
and administrative costs.) |
| |
Marlborough
Elementary School(Under design) |
| Marlborough,
New Hampshire |
| |
New
Elementary School |
49,8000
S.F. |
|
| |
Total
Project |
$10,960,000 |
|
| |
Pinkerton
Academy - Freshman Academy Building (Under construction) |
| Derry,
New Hampshire |
| |
New
Academic Building |
135,000
S.F. |
|
| |
New
Track & Athletic Fields |
|
|
| |
Total
Project |
$30,700,000 |
|
| |
| |
Structural
Engineer |
JSN
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering & Light Design |
| |
Civil
Engineer |
Meridian
Land Services |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
Amherst
Schools(Under construction)
|
Amherst,
NH
|
| |
Amherst
Middle School |
$706,090 |
|
| |
Wilkins
Elementary School |
$2,249,270 |
|
| |
Clark
Elementary School |
$1,039,640 |
|
| |
Total
Project |
$3,995,000 |
|
| |
| |
Structural
Engineer |
Steffenson
Engineering |
| |
Mechanical
Engineer |
Integrated
Engineered Systems |
| |
Electrical
Engineer |
Reno
Engineering & Light Design |
| |
Construction
Manager |
Conneston
Construction, Inc. |
|
| |
Londonderry
South Elementary School(Under construction) |
| Londonderry,
New Hampshire |
| |
Additon
& Renovations |
14,400
S.F. |
|
| |
Total
Project |
$5,500,000 |
|
| |
| |
Structural
Engineer |
Steffenson
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates Engineering |
| |
Electrical
Engineer |
Reno
Engineering & Light Design |
| |
Civil
Engineer |
Stantec |
|
| |
Construction
Manager |
ProCon
Construction |
|
| |
Newport
Schools(Under construction)
|
Newport,
NH
|
| |
Middle/High
School |
$2.973,000
|
|
| |
Richards
Elementary School |
$7,178,000
|
|
| |
Towle
School |
$324,000
|
|
| |
Total
Project |
$10,475,000
|
|
| |
| |
Structural
Engineer |
Fisher
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering & Light Design |
| |
Construction
Manager |
Eckman
Construction |
|
| |
Jaffrey
Rindge Middle School & Conant High School Addition & Renovation,
(under constr) |
| Jaffrey,
New Hampshire |
| |
Addition
& Renovation |
18,000
S.F. |
|
| |
Total
Project |
$9,961,000 |
|
| |
| |
Structural
Engineer |
Fisher
Engineering |
| |
Mechanical
Engineer |
WV
Engineers |
| |
Electrical
Engineer |
WV
Engineers |
| |
Civil
Engineer |
Meridian
Land Services |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
Epping
Middle / High School, 2007 |
| Epping,
New Hampshire |
| |
Addition |
76,300
S.F. |
|
| |
Total
Project |
$12,500,000 |
|
| |
| |
Structural
Engineer |
Fisher
Engineering |
| |
Mechanical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Electrical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Civil
Engineer |
Provan
and Lorber Engineering |
|
| |
Construction
Manager |
Conneston
Construction Inc |
|
| |
Bedford
Middle / High School, 2007 |
| Bedford,
New Hampshire |
| |
New
Middle/High School |
336,000
S.F. -1,900 students |
|
| |
Total
Project |
$50,000,000 |
|
| |
| |
Structural
Engineer |
JSN
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Meridian
Land Services |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
New
Hampshire Community Technical College Addition, 2007 |
| Manchester,
New Hampshire |
| |
New
Kindergarten |
55,0000
S.F. |
|
| |
Total
Project |
$9,170,000 |
|
| |
| |
Structural
Engineer |
JSN
Associates |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering & Light Design |
| |
Civil
Engineer |
Meridian
Land Services |
|
| |
General
Contractor |
Eckman
Construction |
|
| |
Goffstown
Kindergarten, 2006 |
| Goffstown,
New Hampshire |
| |
Health
Education & Library Addition |
16,330
S.F. |
|
| |
Total
Project |
$3,346,000 |
|
| |
| |
Structural
Engineer |
Steffensen
Engineering |
| |
Mechanical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Electrical
Engineer |
Rist-Frost
Shumway Enginering |
| |
Civil
Engineer |
True
Engineering |
|
| |
Construction
Manager |
Pro
Con Construction |
|
| |
Londonderry
North School Addition & Renovation, 2006 |
| Londonderry,Hampshire
New |
| |
Additon |
16,060
S.F. |
|
| |
Renovations |
|
|
| |
Total
Project |
$5,500,000 |
|
| |
| |
Structural
Engineer |
Fisher
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Reno
Enginering |
| |
Civil
Engineer |
Holden
Engineering |
|
| |
Construction
Manager |
Pro
Con Construction |
|
| |
Heron
Pond Elementary School Addition, 2006 |
| Milford,Hampshire
New |
| |
| |
Addition |
21,430
S.F. |
|
| |
Total
Project |
$3,300,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost
Shumway Engineering |
| |
Mechanical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Electrical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Civil
Engineer |
Holden
Engineering |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
Winnacunnet
High School, 2006 |
| Hampton,
New Hampshire |
| |
New
Free-standing Gymnasium |
45,000
S.F. |
|
| |
High
School Renovations |
57,300
S.F. |
|
| |
High
School Addition |
50,000
S.F. |
|
| |
Site
Renovations |
|
|
| |
Total
Project |
$26,850,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost
Shumway Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Rist-Frost
Shumway Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
|
| |
Construction
Manager |
Pro
Con Construction |
|
| |
Barka
Elementary School, 2005 |
| Derry,
New Hampshire |
| |
New
Elementary School |
94,000
S.F. - 700 students |
|
| |
Total
Project |
$13,615,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Jesseman,
Gallant & Associates |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
Hood
Middle School Additions and Renovations, 2005 |
| Derry,
New Hampshire |
| |
Additions
|
66,000
S.F. |
|
| |
Renovations |
|
|
| |
Total
Project |
$10,338,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Jesseman,
Gallant & Associates |
|
| |
Construction
Manager |
Eckman
Construction |
|
| |
Merrimack
Middle School, 2004 |
| Merrimack,
New Hampshire |
| |
New
Middle School |
120,000
S.F. - 875 students |
|
| |
Total
Project |
$17,664,000 |
|
| |
| |
Structural,
Mech and Elec. Engineers |
Rist-Frost-Shumway
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
Hutter
Construction |
| |
Kensington
Elementary School Addition, 2004 |
| Kensington,
New Hampshire |
| |
Additions |
14,240
S.F. |
|
| |
Renovations |
|
|
| |
Total
Project |
$1,950,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Parker
Survey and Engineering |
|
| |
General
Contractor |
Brookstone
Builders |
|
| |
| Londonderry
High School Additions and Renovations, 2003 |
| Londonderry,
New Hampshire |
| |
High
School Gym Building |
49,000
S.F. |
|
| |
High
School Additions |
28,000
S.F. |
|
| |
High
School Renovations |
|
|
| |
Total
Project |
$13,700,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Construction
Manager |
ProCon
Construction, Co. |
| |
| Winnisquam
Regional High and Middle Schools Additions, 2003 |
| Tilton,
New Hampshire |
| |
High
School Addition |
62,500
S.F. |
|
| |
High
School Renovations |
55,900
S.F. |
|
| |
Middle
School Addition |
16,800
S.F. |
|
| |
Middle
School Renovations |
53,500
S.F. |
|
| |
Total
Project |
$16,453,000 |
|
| |
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
McGill
Engineering |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
White
Mountain Survey Co., Inc. |
| |
Construction
Manager |
Bonnette,
Page and Stone |
| |
|
| Brett
Elementary School Additions, 2003 |
| Tamworth,
New Hampshire |
| |
Addition |
22,740
S.F. |
|
| |
Total
Project |
$3,200,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
White
Mountain Survey Co., Inc. |
| |
Construction
Manager |
Bauen
Corporation |
| |
|
|
|
| Pinkerton
Academy Arts and Humanities Center, 2002 |
| Derry,
New Hampshire |
| |
New
Arts Building and Theatre |
130,000
S.F. |
|
| |
Total
Project |
$17,900,000
|
|
| |
|
|
|
| |
Structural
Engineer |
Rist-Frost-Shumway |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
Bonnette,
Page and Stone |
| |
|
|
|
| Hills
Garrison Elementary School |
| Memorial
Middle School Additions and Renovations, 2002 |
| Hudson,
New Hampshire |
| |
New
Elementary School |
75,000
S.F. |
|
| |
Middle
School Addition |
44,600
S.F. |
|
| |
Total
Project |
$17,625,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffensen
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
Eckman
Construction, Inc. |
| |
|
|
|
| Freedom
Elementary School Addition, 2002 |
| Freedom,
New Hampshire |
| |
Addition |
14,800
S.F. |
|
| |
Total
Project |
$2,000,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Rist-Frost-Shumway
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
White
Mountain Survey Co., Inc. |
| |
Construction
Manager |
Bauen
Construction |
| |
|
|
| Moose
Hill School (Londonderry Kindergarten Building), 2001 |
| Londonderry
, New Hampshire |
| |
New
Kindergarten Building |
35,000
S.F. |
|
| |
Total
Project |
$4,484,800 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffensen
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
ProCon |
| |
|
|
| Heron
Pond Elementary School 2001 |
| Milford,
New Hampshire |
| |
New
Elementary School |
87,000
S.F. |
|
| |
Total
Project |
$8,895,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffensen
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates, Inc. |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
Bonnette
Page and Stone |
| |
|
|
|
| Madison
Elementary School Addition, 2001 |
| Madison,
New Hampshire |
| |
Addition |
17,790
S.F. |
|
| |
Total
Project |
$2,000,000 |
|
| |
|
|
|
| |
Structural
Engineer |
sss |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Construction
Manager |
Bauen
Construction |
| |
|
|
|
| Rochester
Kindergarten Additions, 2000 |
| Rochester,
New Hampshire |
| |
4 Additions
|
15,300
S.F. |
|
| |
Total
Project |
$3,580,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffendon
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
eee |
| |
Civil
Engineer |
ccc |
| |
Construction
Manager |
ProCon |
| |
|
|
|
| Derry
Elementary School Addition, 2000 |
| Derry,
New Hampshire |
| |
2 Additions |
36,000
S.F. |
|
| |
Total
Project |
$5,115,000 |
|
| |
|
|
|
| |
Structural/Mechanical/Electrical |
Rist-Frost-Shumway
Engineering |
| |
Civil
Engineer |
Meridian
Land Services, Inc. |
| |
Construction
Manager |
ProCon |
| |
|
|
|
| Windham
Schools Addition, 2000 |
| Windham,
New Hampshire |
| |
Center
School Addition |
37,200
S.F. |
|
| |
Middle
School Addition |
14,200
S.F. |
|
| |
Total
Project |
$5,992,000 |
|
| |
|
|
| |
Structural |
Steffensen
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Rist-Frost-Shumway |
| |
|
|
|
| Parkside
Middle Schools Addition, 1999 |
| Manchester,
New Hampshire |
| |
Addition
|
26,300
S.F. |
|
| |
Total
Project |
$2,440,000 |
|
| |
|
|
| |
Structural/Mechanical/Electrical |
Rist-Frost-Shumway |
| |
|
|
Belmont
High School, 1998 |
| Belmont,
New Hampshire |
| |
New
High School - 500 students |
71,6000
S.F. |
|
| |
Total
Project |
$6,400,000 |
|
| |
|
|
| |
Structural/Electrical |
Rist-Frost-Shumway |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Civil
Engineer |
T
& M Associates |
| |
|
|
|
| Exeter
Region Cooperative Middle School, 1998 |
| Stratham,
New Hampshire |
| |
New
Middle School - 1,250 students |
175,000
S.F. |
|
| |
Total
Project |
$15,700,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Rist-Frost-Shumway |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Jones
& Beach Engineers |
| |
Construction
Manager |
Hutter
Construction |
| |
|
|
|
| McLaughlin
Middle School, 1998 |
| Manchester,
New Hampshire |
| |
New
Middle School - 800 students |
105,000
S.F. |
|
| |
Total
Project |
$9,400,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffensen
Engineering Associates |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Reno
Engineering |
| |
Civil
Engineer |
Costello
Lomasney & DiNapoli |
| |
|
|
|
| Londonderry
Schools Addition, 2000 |
| Londonderry,
New Hampshire |
| |
North
and South Schools Additions |
14,000
S.F. |
|
| |
High
School Addition & Renovation |
28,000
S.F. |
|
| |
Junior
High School Addition & Renovation |
70,000
S.F. |
|
| |
Total
Project |
$10,600,000 |
|
| |
|
|
| |
Structural/Mechanical/Electrical/Civil |
Rist-Frost-Shumway |
| |
|
|
|
| Gilmanton
Elementary School Additions & Renovations, 1997 |
| Gilmanton,
New Hampshire |
| |
Addition
|
24,000
S.F. |
|
| |
Total
Project |
$2,000,000 |
|
| |
|
|
|
| |
Structural/Electrical/Mechanical |
Rist-Frost-Shumway |
| |
|
|
|
| Pinkerton
Academy Science Facility, 1996 |
| Derry,
New Hampshire |
| |
New
Science Building |
70,390
S.F. |
|
| |
Total
Project |
$7,000,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Steffensen
Engineering Associates |
| |
Mechanical
/Electrical Engineer |
A
& K Engineering |
| |
Civil
Engineer |
Rist-Frost-Shumway |
| |
|
|
|
| Timberlane
Regional Middle School Additions, 1996 |
| Plaistow,
New Hampshire |
| |
Addition
|
30,920
S.F. |
|
| |
Total
Project |
$2,945,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Bussiere
Engineering |
| |
Mechanical/Electrical
Engineer |
Rist-Frost-Shumway |
| |
|
|
| West
Running Brook Middle School, 1995 |
| Derry,
New Hampshire |
| |
New
Middle School - 750 students |
107,000
S.F. |
|
| |
Total
Project |
$8,500,000 |
|
| |
|
|
|
| |
Structural
Engineer |
Bussiere
Engineering |
| |
Mechanical
/Electrical Engineer |
A
& K Engineering |
| |
Civil
Engineer |
Appledore
Engineers |
| |
|
|
|
| Greenland
Central School Additions & Renovations, 1995 |
| Greenland,
New Hampshire |
| |
Additions
and Renovations |
16,100
S.F. |
|
| |
Total
Project |
$1,607,380 |
|
| |
|
|
|
| |
Structural
Engineer |
Bussiere
Engineering |
| |
Mechanical
Engineer |
Yeaton
Associates |
| |
Electrical
Engineer |
Robert
W. Bura, Inc. |
| |
|
|
|
| Shaker
Regional High School Renovations, 1995 |
| Belmont/Canterbury,
New Hampshire |
| |
Renovations |
20,000
S.F. |
|